This container complex was built to the customer’s order and assembled on site. The complex has a complete sanitary installation and was also insulated in line with the EnEV 2009 (German energy saving ordinance).
This container complex was built to the customer’s order and assembled on site. The complex has a complete sanitary installation and was also insulated in line with the EnEV 2009 (German energy saving ordinance).